ABSTRACT

Recent improvements at Enterride‘s Trail Rider Memphis Operation bought Pete Grant, the Trail Rider Plant Manager, and his team a little more time, but Pete knew much more was needed to save the plant. They needed a breakthrough, a true game changer. Then someone told Pete about a process called 3P that could lead to unprecedented improvement when

chapter 1|6 pages

- A Case for Change

chapter 2|18 pages

- Pre-3P: The Art of Air Guitar

chapter 3|16 pages

- The Moonshiner

chapter 4|12 pages

- Building a Case

chapter 5|18 pages

- Preparing for the Preparing

chapter 6|18 pages

- The Right Start

chapter 7|24 pages

- A Benchtop View

chapter 8|26 pages

Simulate– Observe– Kaizen– Repeat

chapter 9|12 pages

- The Other Flows

chapter 10|12 pages

The Vertical Start- Up