ABSTRACT

For the bridge maintenance strategy and planning must be required to predict future performance based on the current performance, it is possible more rational decision-making through the higher accuracy of the prediction model. While performing a detailed inspection of the entire bridge can reduce a significant part of the uncertainty, it is impossible to reduce the uncertainty of inspection result and it is always evaluated by probability. In this study, to solve this problem, a Bayesian update method is applied to the optimal maintenance strategy in Bridge Management System (BMS) considering probability of measuring error. Also, examples of application are presented, showing the effects of inspection and updating on the optimization of the bridge maintenance strategies. In this study, application possibility and availability of domestic bridge management system are evaluated by referring to the proposed method in the existing trends.